New Madrid Floodway

Ten Mile Pond Conservation Area in the New Madrid Floodway

Ten Mile Pond Conservation Area in the New Madrid Floodway

How many times do we have to petition to stop the closing of the New Madrid Floodway? Once again its closure in on the agenda. Find the petition here: http://org2.salsalabs.com/o/7288/p/dia/action3/common/public/?action_KEY=23677.

Please sign.

If you do a search for New Madrid Floodway in the search box, you will find all my postings on this subject.

In the meantime read this from 2013 if you want to understand how the floodway came about, its importance for flood control on the Lower Mississippi, and importance to places like Ten Mile Pond and Big Oak Tree State Park.

It’s baaaack: The closure of the foot of the New Madrid Floodway is back on the agenda of folks who farm the floodway and see there land flooded every year the Mississippi Floods. If you remember, two years ago the floodway was opened to provide extra storage capacity for the flooded Mississippi. But every time the river floods water backs up into the floodway at its foot.

It seems that Senator Roy Blunt is pressuring the Obama Administration to go forward with the closure of the floodway by putting a hold on President Barack Obama’s nomination of Gina McCarthy as head of the Environmental Protection Agency (EPA).

I cut the following essay from The Mississippi, because the issue had been resolved in 2007 when U.S. District Judge James Robertson of the District of Columbia ordered the project halted and the work already accomplished dismantled. It had not. Soon after the Memphis District of the US Army Corps of Engineers began working to satisfy the court’s objections to the closure of the floodway. However, the U.S. Fish and Wildlife Service and others who object to the project or no more satisfied with it as it stands now than they were when the judge ruled in 2007. These things never go away. This link will help you understand where the project stands now.

The following is the full story as it stood in 2007:

The St. Johns Bayou-New Madrid Floodway Project

In 1928 when General Edgar Jadwin and the Corps of Engineers designed the New Madrid Floodway, the agency left a 1,500-foot gap at the foot of the setback levee for the release of floodwater and installed a fuse plug levee at Birds Point at its head. The designers understood that the lower third would become a backwater storage area. To compensate landowners for the use of their land, the agency purchased flood easements in the upper two-thirds. That wasn’t necessary in the lower third, which would flood with the river every time. It was the floodway’s role as a backwater storage area that created an uproar at the beginning of the twenty-first century, when the Crops published its plan for the St. Johns Bayou-New Madrid Floodway Project, which promised to eliminate backwater flooding in the New Madrid Floodway.

The Water Resources Development Act of 1986 authorized the dredging of St. Johns Bayou for flood control, the St. Johns Bayou Pump Station, which included a gated culvert across the foot of the bayou, and the New Madrid Pump Station and a gated culvert set in the 1,500-gap in the setback levee of the New Madrid Floodway. St. Johns Bayou Basin is located between the setback levee and Sikeston Ridge. The gated culverts would halt backwater flooding from the river, but assure interior flooding in both St. Johns Bayou basin, located between the setback levee and Sikeston River, and in the New Madrid Floodway. The pumps would clear water ponding behind the closed culverts. The culvert across St. Johns Bayou was built. In 1997 the Memphis District of the Corps of Engineers filed its intent to prepare and environmental impact study of the project.

Environmentalists, river conservationists, the Environmental Protection Agency, the U.S. Fish and Wildlife Service, the Missouri Department of Conservation, the Missouri Department of Natural Resources, and taxpayer watchdogs: all objected. They balked at closing the last connection the Mississippi had to its floodplain in Missouri, at the $65 million cost, at the damage that would be done to Big Oak Tree State Park, at the loss of spawning habitat for fishes and wintering places for waterfowl, to the channelizing of St. Johns Bayou and other drainage ditches. They complained that the project would benefit a handful of big landowners. They noted that East Prairie in the St. Johns Bayou Basin would continue to flood due to runoff from roofs and parking lots. They encouraged the Corps to find non-structural solutions to the flooding problems, including a ring levee around East Prairie.

The East Prairie Enterprise Community, the local sponsor of the project, and other residents of Swampeast, weren’t interested in environmentalists’ concerns. East Prairie residents complained that a ring levee would cut them off from the rest of the world. Farmers gave little support to the Wetland Reserve Program. They had rejected a 1993 U.S. Fish and Wildlife Service offer to purchase land in the St. Johns Bayou basin for a national wildlife refuge at fair market value. Nor were they interested in converting their lands from crops to timber.

In September 2000 the Memphis District sought to please both the environmentalists and the residents of Mississippi County when it revised its plan. The floodgate and the pumps would stay, but the following changes would be made: the Corps would dredge only the St. Johns Bayou-St. James Bayou drainage ditch, reduce its width from 200 feet to 120 feet, and excavate only one side to avoid cutting into forests. The engineers would not dredge the upper 3.7 miles of St. James Bayou Ditch to avoid the habitat of the golden topminnow, a state endangered fish; would avoid mussel beds or relocate them and set up a ten-year monitoring program. They would set rock structures in the channels to enhance fish habitat; move water in and out of the lower reaches of the floodway and the basin for winter and early spring waterfowl and to allow spawning fish to pass to and from the river; purchase conservation easements on 765 acres of herbaceous land along the channel to replace shorebird habitat; reforest 9,557 acres of seasonally flooded cropland. At Big Oak Tree State Park they would build a control structure to regulate water in its swamps–enough for the cypress, but not too much for the oaks.

Big Oak Tree State Park

The Corps published essentially the same plan in June 2002, but added the construction of the wildlife corridor between Big Oak Tree Park and the Ten Mile Pond conservation area and riparian buffers along sixty-four miles of streams and drainage channels to filter water flowing to Big Oak Tree. Most important, the engineers made the commitment to the restoration of Big Oak Tree, purchasing and reforesting 1,800 acres surrounding the park and restoring the park’s hydrologic connection to the Mississippi with water control structures in the park, a canal with gated culverts set in the mainline levee to allow water to flow between the park and the river. The cost of the new plan came to $85 million dollars and still did not satisfy the Missouri Department of Natural Resources, the owner of Big Oak Tree Park.

In 2004 the Memphis District issued a contract for the construction of the New Madrid closure and the pump, but stopped work on the project when National Wildlife Federation and the Environmental Defense Fund filed suit in Federal Court, alleging violations of the Clean Water Act.

In December 2005 the Corps published a second Revised Supplemental Environmental Impact that would allow fish to spawn in the sumps behind the culverts and would reestablish the hydrological connection between Big Oak Tree and St. James Bayou through a culvert in the levee.

The Corps pointed out repeatedly that the success of the project depended on finding people willing to sell their land for mitigation to add 1,800 acres to Big Oak Tree State Park or the addition 1037 acres needed for the wildlife corridor and riparian buffers.

In the fall of 2006 the Corps of Engineers started work on the project, even after being told they would likely lose the Federal suit filed two years earlier. The suit came to fruition in September 2007, when U.S. District Judge James Robertson of the District of Columbia ordered the project halted and the work already accomplished dismantled.

 

Advertisements

The St. Johns Bayou-New Madrid Floodway Project

1 Mississippi is hosting a webinar on Monday, June 17 at 2:00 PM CDT on the proposal to close the New Madrid Floodway at its foot. Click here:  https://attendee.gotowebinar.com/register/8363148575022700544 to register for the webinar.

It’s baaaack: The closure of the foot of the New Madrid Floodway is back on the agenda of folks who farm the floodway and see there land flooded every year the Mississippi Floods. If you remember, two years ago the floodway was opened to provide extra storage capacity for the flooded Mississippi. But every time the river floods water backs up into the floodway at its foot.

It seems that Senator Roy Blunt is pressuring the Obama Administration to go forward with the closure of the floodway by putting a hold on President Barack Obama’s nomination of Gina McCarthy as head of the Environmental Protection Agency (EPA).

I cut the following essay from The Mississippi, because the issue had been resolved in 2007 when U.S. District Judge James Robertson of the District of Columbia ordered the project halted and the work already accomplished dismantled. It had not. Soon after the Memphis District of the US Army Corps of Engineers began working to satisfy the court’s objections to the closure of the floodway. However, the U.S. Fish and Wildlife Service and others who object to the project or no more satisfied with it as it stands now than they were when the judge ruled in 2007. These things never go away. This link will help you understand where the project stands now.

The following is the full story as it stood in 2007:

Ten Mile Pond Conservation Area in the New Madrid Floodway

Ten Mile Pond Conservation Area in the New Madrid Floodway

The St. Johns Bayou-New Madrid Floodway Project

In 1928 when General Edgar Jadwin and the Corps of Engineers designed the New Madrid Floodway, the agency left a 1,500-foot gap at the foot of the setback levee for the release of floodwater and installed a fuse plug levee at Birds Point at its head. The designers understood that the lower third would become a backwater storage area. To compensate landowners for the use of their land, the agency purchased flood easements in the upper two-thirds. That wasn’t necessary in the lower third, which would flood with the river every time. It was the floodway’s role as a backwater storage area that created an uproar at the beginning of the twenty-first century, when the Crops published its plan for the St. Johns Bayou-New Madrid Floodway Project, which promised to eliminate backwater flooding in the New Madrid Floodway.

The Water Resources Development Act of 1986 authorized the dredging of St. Johns Bayou for flood control, the St. Johns Bayou Pump Station, which included a gated culvert across the foot of the bayou, and the New Madrid Pump Station and a gated culvert set in the 1,500-gap in the setback levee of the New Madrid Floodway. St. Johns Bayou Basin is located between the setback levee and Sikeston Ridge. The gated culverts would halt backwater flooding from the river, but assure interior flooding in both St. Johns Bayou basin, located between the setback levee and Sikeston River, and in the New Madrid Floodway. The pumps would clear water ponding behind the closed culverts. The culvert across St. Johns Bayou was built. In 1997 the Memphis District of the Corps of Engineers filed its intent to prepare and environmental impact study of the project.

Environmentalists, river conservationists, the Environmental Protection Agency, the U.S. Fish and Wildlife Service, the Missouri Department of Conservation, the Missouri Department of Natural Resources, and taxpayer watchdogs: all objected. They balked at closing the last connection the Mississippi had to its floodplain in Missouri, at the $65 million cost, at the damage that would be done to Big Oak Tree State Park, at the loss of spawning habitat for fishes and wintering places for waterfowl, to the channelizing of St. Johns Bayou and other drainage ditches. They complained that the project would benefit a handful of big landowners. They noted that East Prairie in the St. Johns Bayou Basin would continue to flood due to runoff from roofs and parking lots. They encouraged the Corps to find non-structural solutions to the flooding problems, including a ring levee around East Prairie.

The East Prairie Enterprise Community, the local sponsor of the project, and other residents of Swampeast, weren’t interested in environmentalists’ concerns. East Prairie residents complained that a ring levee would cut them off from the rest of the world. Farmers gave little support to the Wetland Reserve Program. They had rejected a 1993 U.S. Fish and Wildlife Service offer to purchase land in the St. Johns Bayou basin for a national wildlife refuge at fair market value. Nor were they interested in converting their lands from crops to timber.

In September 2000 the Memphis District sought to please both the environmentalists and the residents of Mississippi County when it revised its plan. The floodgate and the pumps would stay, but the following changes would be made: the Corps would dredge only the St. Johns Bayou-St. James Bayou drainage ditch, reduce its width from 200 feet to 120 feet, and excavate only one side to avoid cutting into forests. The engineers would not dredge the upper 3.7 miles of St. James Bayou Ditch to avoid the habitat of the golden topminnow, a state endangered fish; would avoid mussel beds or relocate them and set up a ten-year monitoring program. They would set rock structures in the channels to enhance fish habitat; move water in and out of the lower reaches of the floodway and the basin for winter and early spring waterfowl and to allow spawning fish to pass to and from the river; purchase conservation easements on 765 acres of herbaceous land along the channel to replace shorebird habitat; reforest 9,557 acres of seasonally flooded cropland. At Big Oak Tree State Park they would build a control structure to regulate water in its swamps–enough for the cypress, but not too much for the oaks.

Big Oak Tree State Park

Big Oak Tree State Park

The Corps published essentially the same plan in June 2002, but added the construction of the wildlife corridor between Big Oak Tree Park and the Ten Mile Pond conservation area and riparian buffers along sixty-four miles of streams and drainage channels to filter water flowing to Big Oak Tree. Most important, the engineers made the commitment to the restoration of Big Oak Tree, purchasing and reforesting 1,800 acres surrounding the park and restoring the park’s hydrologic connection to the Mississippi with water control structures in the park, a canal with gated culverts set in the mainline levee to allow water to flow between the park and the river. The cost of the new plan came to $85 million dollars and still did not satisfy the Missouri Department of Natural Resources, the owner of Big Oak Tree Park.

In 2004 the Memphis District issued a contract for the construction of the New Madrid closure and the pump, but stopped work on the project when National Wildlife Federation and the Environmental Defense Fund filed suit in Federal Court, alleging violations of the Clean Water Act.

In December 2005 the Corps published a second Revised Supplemental Environmental Impact that would allow fish to spawn in the sumps behind the culverts and would reestablish the hydrological connection between Big Oak Tree and St. James Bayou through a culvert in the levee.

The Corps pointed out repeatedly that the success of the project depended on finding people willing to sell their land for mitigation to add 1,800 acres to Big Oak Tree State Park or the addition 1037 acres needed for the wildlife corridor and riparian buffers.

In the fall of 2006 the Corps of Engineers started work on the project, even after being told they would likely lose the Federal suit filed two years earlier. The suit came to fruition in September 2007, when U.S. District Judge James Robertson of the District of Columbia ordered the project halted and the work already accomplished dismantled.

Low Water on the Mississippi and Thebes Gap

Thebes Gap:

Alexander County, Illinois

“Here is a vast ledge of rocks, which stretch across the river in a direct line. The best channel in the middle of the river, in which place in low water, there is not more than six feet over the rocks.”–Zadoc Cramer, 1814

Rock Formation in the Middle Mississippi at Thebes Gap, 2006

Rock Formation in the Middle Mississippi at Thebes Gap, 2006

The Mississippi is running very low. After the Flood of 2011, the river drained away very quickly and the rain stopped. By the Summer of 2012, we in the Midwest were well into the Drought of 2012 and the river was showing the effects. Now in January 2013, the Upper Mississippi is frozen and the system of locks and dams is retaining water north of Alton, Illinois. On the Missouri a similar system of dams is retaining water in South Dakota and too little water is flowing into the Mississippi to maintain water levels for the 9-foot navigation channel on the Middle River.

Look at any aerial photograph of the confluence of the Missouri and Mississippi. The muddy Missouri spews a flume of silty water into the relatively clear Mississippi. They flow side by side downstream--the Missouri on the west, the Mississippi on the east--for several miles. During the very cold winter of 2000-2001 it was possible to see this phenomenon from the Illinois bank near the spot where Lewis and Clark started their journey up the Missouri: Lock and Dam 26 at Alton trapped ice coming down the Mississippi. South of the dam the river flowed free of ice, but ice did flow out of the mouth of the Missouri. At the confluence the two rivers, the icy Missouri and the ice-free Mississippi flowed side by side in the Mississippi channel.

Look at any aerial photograph of the confluence of the Missouri and Mississippi. The muddy Missouri spews a flume of silty water into the relatively clear Mississippi. They flow side by side downstream–the Missouri on the west, the Mississippi on the east–for several miles. During the very cold winter of 2000-2001 it was possible to see this phenomenon from the Illinois bank near the spot where Lewis and Clark started their journey up the Missouri: Lock and Dam 26 at Alton trapped ice coming down the Mississippi. South of the dam the river flowed free of ice, but ice did flow out of the mouth of the Missouri. At the confluence the two rivers, the icy Missouri and the ice-free Mississippi flowed side by side in the Mississippi channel. In the Winter of 2013 too little water is spewing out of the Missouri to feed the Middle Mississippi.

 Thebes Gap is the geological break point between the Upper Mississippi and the Lower Mississippi. The Upper Mississippi flows through a rocky gorge from Minneapolis to Thebes Gap. South of there the Lower Mississippi meanders across an alluvial plain.

At the beginning of the glacial age, the Lower Mississippi flowed along the western valley wall through an alluvial floodplain in the Western Lowlands along the Black, White, and St. Francis Rivers.

From The Mississippi: “Geologists have speculated that the river abandoned its alluvial valley and diverted through Thebes Gap, a narrow bedrock canyon in the Benton Hills, through the series of glacial floods at the end of the Wisconsinan age. At the beginning of the twenty-first century, seismologists questioned why the Mississippi would abandon its comfortable alluvial valley to ream a new course through bedrock. They noted that fault lines in the Benton Hills were active 10,000 years ago, and speculated that an earthquake along fault lines in the Benton Hills opened the canyon that is Thebes Gap. Glacial River Warren, which broke out of a glacial lake that covered northern Minnesota and North Dakota and reached north into Canada,  thundered through it, and deposited a classical alluvial fan at the mouth of the canyon.”

 “Thebes at the head of the Grand Chain and Commerce at the foot of it were towns easily rememberable as they had not undergone conspicuous alteration. Nor the Chain, either–in the nature of things; it is a chain of sunken rocks admirably arranged to capture and kill steamboats on bad nights.–Mark Twain, Life on the Mississippi

Thebes Gap, where the Mississippi takes a wide turn into the narrow reach of Thebes Gap.

Thebes Gap, where the Mississippi takes a wide turn into the narrow reach of Thebes Gap.

Mark Twain knew Thebes Gap, and while it is no longer killing steamboats, this winter modern tows can’t get through this narrow gorge between the Upper Mississippi and the Lower Mississippi.

The U.S. Army Corps of Engineers have contracted with Newt Marine and Kokosing, a marine engineering firm out of Iowa and Michigan,  to remove the rocks from Thebes Gap. When they are done there on January 11, they will move on to Grand Tower.

A tow steams passed Tower Rock at the beginning of December.

A tow steams passed Tower Rock at the beginning of December.

The river level today at Chester, Illinois is -0.6 feet, which means it is possible to walk out to Tower Rock and see just how low the Mississippi is.


[i]             Cramer, 173; Harrison, Richard W., “Report on Investigations of the Benton Hills, Scott County, Missouri, in Midwest Friends of the Pliestocene, 42nd Annual Meeting, 19-21 May 1995, 7.3; Harrison, Richard W., “Mid-Continent Urban Corridor Mapping Project,” USGS Project No.: 7160-11, U.S. Geological Survey, http://erp-web.er.usgs.gov/reports/annsum/vol40/cu/harrison.htm; Elfrink, Neil, “Gujarat Analog Response,” Archives of Central U.S. Earthquake Hazard MailList, March 21, 2001, http://clifty.com/hazard/archives/1010302-021954.html; Guccione, Margaret, “Re: ‘Gujarat Analog,’” Archives of Central U.S. Earthquake Hazard MailList, Feb 16, 2001, http://clifty.com/hazard/archives/1010216-111758.html.

Mardi Gras Pass: Keep it or Dam It

Mississippi River Ridge at Bohemia

While folks partied in the streets of New Orleans on Fat Tuesday, the Mississippi River gave the State of Louisiana a gift, a freebie. The river broke through the low ridge at Bohemia, south of the end of the Main Line levee, and began pouring sediment into Breton Sound to the east. The river is doing for free what the state would have the Federal Government pay $50 billion over 50 years to rebuild barrier island and to divert the Mississippi to Breton Sound on the east and the Barataria Basin on the west. State engineers already had a plan on the books to create a similar diversion into Breton Sound a mere mile from the Bohemia siphon, where the breach occurred.

Bohemia Siphon along the Mississippi

The site of the breech was the old, inoperable siphon, designed to deliver fresh water from the river to the wetlands in the sound. The siphon opens onto a spillway, created in 1924 as a means of relieving flooding in New Orleans. However, this spillway is 45 miles south of New Orleans. After the Flood of 1927 the Bonne Carre Spillway and the Achafalaya and Morganza Spillways were design to siphon water from a flood Mississippi before it reached New Orleans.

Sites of Bohemia Siphon and the Oil Facility on the End of the Road on the Mississippi Ridge

Now the U.S. Army Corps of Engineers has given Houston-based Eland/Sundown Energy permission to seal the crevasse, dam it in order to rebuild the road to their work facility not more than two or three miles down the road, where it ends at a gate to its yard.

Right now the Mississippi is low, very low and the spillway is delivery fresh water and sediment at a much slower rate than the 50,000 cubic feet per second the state-designed spillway would flow. But water and sediment is flowing to Breton Sound. It is a gift from the Flood of 2011. The river will rise again, flood, and spill more water through the breach, enlarging it and sending more water and sediment to the Bohemia Wildlife Management Area and Breton Sound.

Breton Sound at the Bohemia State Wildlife Management Area just off Pointe a la Hache

In 2005 Katrina roared across the Mississippi south of the siphon, and tore north through Breton Sound and Lake Borgne tearing up the wetlands and busting through the levees that protected St. Bernard Parish, trashing the towns there. Then it tore across the wetlands that protects that lovely string of towns on the the State of  Mississippi coast–Bay St. Louis, Pass Christian, Gulf Port, and Biloxi–and destroyed them. Had those wetlands in Breton Sound been in tact, Katrina would not have been as devastating. Never mind what happened after it arrived in Lake Pontchartrain, washed into the canals that drain every drop of water that falls on New Orleans, and collapsed the levees that contained them, flooding the city.

  •  (quintascott.wordpress.com)

The Economic Value of Louisiana’s Coastal Wetlands

Crab Boat on Bayou Penchant in the Western Terrebonne Basin

Rep. Rodney Frelinghuysen, (R-New Jersey) chair of the House Energy and Water Appropriations Committee has released his Energy and Water Appropriations Bill for 2013. This bill covers appropriations for the Department of Energy (Nuclear Security, Gasoline prices, Energy programs, Yucca Mountain, Science Research, Environmental Management) the Corps of Engineers, and the Bureau of Reclamation.

The New Orleans Picayune took note of the fact that Mr. Frelinghuysen’s bill, which includes $4.8 billion for the Corps of Engineers) included no money for Coastal Restoration. He wants to see the Corps of Engineers focus on navigation and flood control projects to the exclusion of environmental projects, including those requested in President Obama’s budget. He notes that such projects are “job creators.” President Obama had proposed $4.7 billion for the Corps budget for 2013, including $16.8 million for ecosystem restoration in Louisiana.

So, what is the value of Louisiana’s coastal wetlands?

From The Mississippi

“Before Katrina and Rita (seven years ago) tore through Louisiana’s coastal marshes, the environmental and economic necessity of a healthy system of wetlands was little understood outside the state. After Katrina and Rita we finally understood that Louisiana’s coastal wetlands buffer storms. But, we still needed to learn that they absorb nutrients, sediment, and contaminants. They serve as the breeding, spawning, feeding, and nursery grounds for fish and shellfish at some time in their life cycles. Summer flounder, spotted seatrout, snook, tarpon, and others spawn in the Gulf, migrate to their freshwater nurseries in the summer, and return to the Gulf when temperatures drop in the fall. So do juvenile brown and white shrimp. Migratory birds rest on Louisiana’s barrier islands on their annual migration from Central and South America. Waterfowl, wading birds, and shorebirds colonize its freshwater marshes, attracted by their diverse menu of fish and shellfish, broad-leaved plants, tall grasses, and shrubs. The marshes provide habitat for the endangered brown pelican and seventy pairs of bald eagles. Furbears–nutria, muskrat, mink, raccoon, otter, bobcat, beaver, coyote, and opossum–thrive in the marshlands. The American alligator–once endangered, now abundant–nests along the banks of coastal freshwater marshes.

“Louisiana’s commercial fishermen harvest 1.1 billion pounds of fish and shellfish including shrimp, crabs, crayfish, oysters, and finfish, up to twenty percent of the nation’s catch, valued at $2.2 billion a year to Louisiana’s economy. Recreational anglers contribute $944 million. More than forty percent of the nation’s fur harvest comes from Louisiana. Louisiana’s alligator farmers take eggs from the wild, hatch them in captivity, return some to the wild, and harvest the rest, netting $9.3 million in skin and meat.

“Louisiana’s three million acres of coastal wetlands are more productive than many agricultural lands, and they are disappearing at the rate of twenty-five to thirty-five square miles a year. If the loss continues at that rate, commercial and recreational fish would decline by 30%, putting up to 70,000 jobs at risk state-wide. Migratory birds dependent on the marshes might decline, having an impact on the rest of the country, on duck hunters, on bird watchers. Fur trappers would see the loss of a $1.3 million industry. The cost of treating drinking water would rise, along with the cost of salt and other minerals taken from the coast. Alligator meat might once again become a delicacy.”

The Flood of 2011 demonstrated the value of the Mississippi River and Tributaries project in mitigating the severity of a very severe flood. The project was started in the aftermath of the 1927 Flood and is almost complete. It is also as responsible for the  decline of Louisiana’s coastal wetlands as any other factor. Levees extending almost to the mouth of the Mississippi have prevented the river from nourishing the wetland with fresh water and sediment every time it floods. All that water and sediment from last year’s flood was flushed into the Gulf of Mexico, where  it went unused for coastal restoration. But the river and tributaries project is almost finished. The levees are built. The floodways work. The reservoirs on the tributaries that retain floodwater in the uplands until the Mississippi can handle it are done.

The job of the Corps of Engineers in the 21st century should be ecosystem restoration on the Louisiana coast and on the Upper Mississippi, where the work of the 20th century has done so much to destroy wetlands.